About us
Services
All Services
Design Review & Advice
Surveys, Tests & Monitoring
Expert Witness
Sound Insulation Testing
Our Work
Contact
Adnitt EU
Get a quote
Air Tightness Readiness Checklist
Plot Number
Check Date
Checker
Are all floor and/or wall constructions complete and sealed (including any penetrations)?
Yes
No
Has all mastic sealing been completed?
Yes
No
Are all windows ad external doors installed correctly (including front doors)?
Yes
No
Are all sockets, switches and other wall items installed?
Yes
No
Are all lights, including downlights, installed and sealed correctly?
Yes
No
Does the dwelling have mechanical ventilation?
Yes
No
If yes; is the ventilation installed, connected, sealed and turned off?
Yes
No
Has the plumbing been completed and connected in all locations including the heating?
Yes
No
Is there water in all the traps?
Yes
No
Is there either 110v or 240v mains power available in or directly outside the dwelling?
Yes
No
Can all adjacent dwelling windows be opened? (above below and to the side)
Yes
No
What is the Design Air Permeability of the Dwelling?
Yes
No
Any other comments and observations:
Thank you!
Your 'Air Tightness Readiness Checklist' form has been sent!
Oops! Something went wrong while submitting the form.
Complete this form online
or
download a PDF of the form below.
Download PDF form