PRE-VISIT SITE CHECKLIST
The following will all need to be checked prior to the site testing visit or abortive fees may be chargeable:

  1. Has the proposed set of tests been agreed with Building Control?
  2. Are all floor and/or wall constructions complete and sealed?
  3. Are all windows, internal and external doors and all sockets, switches, etc. installed?
  4. Are all rooms unfurnished? (if not, contact us to check arrangements)
  5. Temporary floor finishes (e.g. carpets) removed or exposed over at least 50% of floor? (except in a very small number of circumstances, contact us to discuss if necessary)
  6. All works on site to be stopped for the duration of the tests?
  7. Full access to at least two pairs of habitable rooms on either side of the separating floor or party wall (i.e. living room, bedroom, study, etc.)?
  8. Is 110V or 240V mains power available throughout the site?
  9. Are there parking facilities on site?
  10. Has payment for testing been made or separate credit agreement complete? (late payment will delay submission of results, report & certificates)
  11. Have you provided a detailed description of the test separating floor construction
  12. Have you provided a detailed description of the test party wall construction
  13. Is the site address correct? Please provide in full including postcode
  14. Billing name, company and invoicing address (& order number if required)