PRE-VISIT SITE CHECKLIST
The following will all need to be checked prior to the site testing visit or abortive fees may be chargeable:
The following will all need to be checked prior to the site testing visit or abortive fees may be chargeable:
- Has the proposed set of tests been agreed with Building Control?
- Are all floor and/or wall constructions complete and sealed?
- Are all windows, internal and external doors and all sockets, switches, etc. installed?
- Are all rooms unfurnished? (if not, contact us to check arrangements)
- Temporary floor finishes (e.g. carpets) removed or exposed over at least 50% of floor? (except in a very small number of circumstances, contact us to discuss if necessary)
- All works on site to be stopped for the duration of the tests?
- Full access to at least two pairs of habitable rooms on either side of the separating floor or party wall (i.e. living room, bedroom, study, etc.)?
- Is 110V or 240V mains power available throughout the site?
- Are there parking facilities on site?
- Has payment for testing been made or separate credit agreement complete? (late payment will delay submission of results, report & certificates)
- Have you provided a detailed description of the test separating floor construction
- Have you provided a detailed description of the test party wall construction
- Is the site address correct? Please provide in full including postcode
- Billing name, company and invoicing address (& order number if required)